IJTEEE

International Journal of Technology Enhancements and Emerging Engineering Research

Home Contact Us
PUBLICATIONS



IJTEEE >> Volume 1 - Issue 1, August 2013 Edition



International Journal of Technology Enhancements and Emerging Engineering Research  
International Journal of Technology Enhancements and Emerging Engineering Research

Website: http://www.ijteee.org

ISSN 2347-4289



Lean Manufacturing In Chassis Assembly Through Poka-Yoke

[Full Text]

 

AUTHOR(S)

K.Velmanirajan1, G. Rajaraman2, S.K.Karthikeyan3, D.Dinesh4

 

KEYWORDS

Keywords:Lean manufacturing, steering box, Template, silencer, sub assembly.

 

ABSTRACT

ABSTRACT: Some mistakes accruing between the assembly and manufacturing shops in Ashok Leyland ltd. Actually Ashok Leyland, one of the biggest and leading heavy vehicle manufacturers in India and also exporting some specified model vehicles. Every month they come across some customer complaints and sometime face those problems before dispatching in the pre delivery inspection. Even though, some mistakes go up to consumers. So, we received some frequently coming problems, about 12 from the PDI shops. Out of these problems, we took two important Customer affecting problems. Then we were analyzed and provided solutions through the "POKA-YOKE" techniques, it means that mistake proofing solutions for a particular problems.

 

REFERENCES

[1]. S. Tkaczyk, M. Dudek, Quality continuous improvement of production process in aspect of usage quality researches and estimation methods, Proceedings of the 11th Scientific International Conference “Achievements in Mechanical and Materials Engineering”, AMME'2002, Gliwice-Zakopane,,2002, 567-570.

[2]. S. Tkaczyk, M. Dudek, Methodology research of quality in industry, Proceedings of the 7th Scientific International Conference “Achievements in Mechanical and Materials Engineering”, AMME'1998, Gliwice-Zakopane, 1998, 513-516.

[3]. J. Ketola, K. Roberts, Demy stifing ISO 9001:2000 – part 1, „Quality Progress”, 34/9 (2001).

[4]. M. Dudek-Burlikowska, D. Szewieczek, Customer’s satisfaction the element of pro quality strategies of organization, Journal of Achievements in Materials and Manufacturing Engineering 28/1 (2008) 91-94.

[5]. M. Dudek-Burlikowska, Analytical model of technological process correctness and its usage in industrial company, Proceedings of 11th Scientific International Conference “Achievements in Mechanics, Manufacturing and Materials Science”, CAM3 S'2005, Gliwice-Zakopane, 2005 (CD-ROM).

[6]. M. Dudek-Burlikowska, D. Szewieczek, Quality estimation methods used in product life cycle, Journal of Achievements in Materials and Manufacturing Engineering 24/2 (2007) 203-206.

[7]. M. Dudek-Burlikowska, D. Szewieczek, The modern quality control of preproduction sphere in a company, Journal of Achievements in Materials and Manufacturing Engineering 30/1 (2008) 79-86.

[8]. P.S. Pande, R.R. Neuman, R.R. Cayanagh, Six Sigma – The Six Sigma way: how GE, Motorola, and other top companies are honing their performance, K.E. Liber S.C.,Warsaw, 2003 (in Polish).

[9]. H.àachajczyk, M. Dudek-Burlikowska, Quality continuous improvement of companies with usage the Poka-Yoke methods, PSKN 7/2006, 57-64, (in Polish).

[10]. K. Ishikawa, Guide to Quality Control. White Plains, NY: Quality Resources, 1982.

[11]. R. Nowosielski, A. Kania, M. Spilka, Integrated recycling technology as a candidate for best available techniques, Archives of Materials Science and Engineering 32/1 (2008) 49-52.

[12]. A. V. Feigenbaum, Total Quality Control: Engineering and Management, 3rd Ed. New York: McGraw Hill, 1983.

[13]. Shimbum N. K., Improving Product Quality by Preventing Defects, Productivity Press, Cambridge, Massachusetts 1998.

[14]. Shinto S., Zero Quality Control: Source Inspection and the Poka–Yoke System, Cambridge, MA: Productivity Press, 1986.

[15]. P. Dvorak, Poka-yoke designs make assemblies mistake- proof, Machine Design, 70/4 (1998) 181-184.

[16]. S. Patel, B.G. Dale, P. Shaw, Set-up time reduction and mistake proofing methods: an examination in precision component manufacturing, The TQM Magazine, 13/3 (2001) 175-179.

[17]. J.R. Grout, B.T. Downs, A Brief Tutorial on Mistake- proofing, Poka-Yoke, and ZQC, www.csob.berry.edu.

[18]. J. Ketola, K. Roberts, Demy stiffing ISO 9001:2000 – part 2, „Quality Progress”, 34/10 (2001)